the actual completion date was set for end of march, , but ive been told it may just run over slightly to mid april.
I hope it doesnt run over too much because i certainly dont want to be hanging about.
There is apparently 130+ names down, but i feel some of these may not follow there interest through as there are a couple of minor inconveniences with mooring in Seaham.
The gate is tidal and they are talking about having it set to just over 1 metre of water then the gates start closing, so in theory if you miss the tide by 10 mins and the gates are closed you could be left hanging about for a few hours, more so on a bigger tide, this would be a problem with larger boats with bigger than 1 metre drafts.
Ove the years there has been a history of vandalism down seaham dock, boats broken into and in 1 case a boat set on fire, so security would need to be stepped up as the last thing i want to come down to is a boat plundered by thieves.
The cost of mooring in Seaham would have to be less than any of the other marinas mainly because of the tidal infringement, it would be a major put off to a lot of people.
I hope everything works out down in Seaham as i live literally 5 minutes walk from it so for me it would be an enormous bonus to have that on my doorstep rather than having to travel to sunderland.